Ultra-Thin Baby Diaper Machine for Merries Baby Nappy
1. Main Technical Parameter
Product size
|
S,M,L,XL
|
Machine weight
|
60T
|
Designed production speed
|
600 pcs/min
|
Stable production speed
|
500 pcs/min
|
Machine size
|
30m*3m*5m
|
Air pressure
|
0.6-0.8MPA
|
Rate of finished product
|
≥98%
|
Efficiency rate
|
≥88%
|
Power
|
280KW
|
Power source
|
380V, 50HZ, 3 phase 8 wire
|
Machine direction
|
Customerization
|
Machine direction
|
Customerization
|
2. Main Function Features
-
Servo motor driving with PLC control and touch screen;
-
High-speed teeth-like crusher;
-
Web-wheel molding;
-
SAP auto adding with amount control;
-
Servo unwinding, auto-tension control and auto splicing for raw materials;
-
Auto reject for wasted products, auto detect & alarm for material exhausted;
-
Phase adjusting during running without stop;
-
Product auto counting and outputting in line.
3. Details
The picture baby diaper for your reference, maybe you can give us the samples what you want in local market. We have a professional R&D team to redesign our machine to produce other kinds of baby diaper as per your requirement.
4. About us
5. Our services
5. Raw materials that we can offer
6. Frequently Asked Question
Q:Are you a machine manufacture or trading company?
A: We are a machine manufacture of baby diaper machine, adult diaper machine, pull on diaper machine, sanitary napkin machine, panty liner machine,underpad machine, pet pad machine, breast pad machine and Underarm pad machine.
Q: What is the delivery time for a set machine?
A: 120 days as a fastest delivery time. As a manufacture, we need time to make our machine perfect in every taspect.
Q: What is your term of payment?
A:T/T is our first choice, L/C at sight is ok as well.
Q: How long is the warranty period?
A: one year after the testing finished at the buyer's workshop.
Q: Will you send the engineer to install machine and train our workers in our factory
A: of course. We will send engineer to installing and training. But the salary and accommodation of technician will be on the buyer' s side. you can sent your engineers to our factory for training, we will offer accommodation.
Q: How long can I get the machine?
A: we will begin to make your machine once we receive your 30% down payment.
around 4 month, we will finish the produce and ask the buyer to check the machine and pay for the rest money.
about 10 days for packing the machine, arrangment of shipping and customs clearance.
some days for the shipping and some days for the customs clearance in the buyers country.
Finally, you can get the machine.